Make sure your new or existing solar system is up and running so we can start processing your application.
We’ll need some basic documents and identification to begin. The utility will run tests on your system, and once you pass, we’ll proceed to the next step.
If you don’t have technical drawings yet, we’ll prepare them. We’ll also handle the application process with the city, though some local governments may require extra documents.
After your application is accepted, we may need to update your service entrance and make other adjustments to meet the utility’s net metering standards.
The utility will conduct one last site inspection. Once you’re approved, you can switch your system settings to begin sending excess power back to the grid.
Create energy, lower your bill and go green with the best partner for your long term solution.
How long does it take to approve the net metering application?
Can you process net metering application if the Meralco bill is not under my name? (ex. previous house owner)
Can I start using the system after installation, even if my net metering application is still in process?