Maximize Solar Savings with Net Metering

Convert excess solar power into credits for day and night savings. We handle the process for you.

Net Metering Diagram

We handle everything from start to finish

1. Activate Your Solar System

Make sure your new or existing solar system is up and running so we can start processing your application.

2. Apply for Net Metering with Your Distribution Utility

We’ll need some basic documents and identification to begin. The utility will run tests on your system, and once you pass, we’ll proceed to the next step.

3. Obtain the Final Electrical Inspection Certificate from the City

If you don’t have technical drawings yet, we’ll prepare them. We’ll also handle the application process with the city, though some local governments may require extra documents.

4. Install Requirements for Net Metering

After your application is accepted, we may need to update your service entrance and make other adjustments to meet the utility’s net metering standards.

5. Final Approval & Start Exporting

The utility will conduct one last site inspection. Once you’re approved, you can switch your system settings to begin sending excess power back to the grid.

See what requirements you need

      Problem with one of these documents?

      Contact us

      Choose to power your place with Blueshift

      Create energy, lower your bill and go green with the best partner for your long term solution.

      FAQ

      How long does it take to approve the net metering application?

      Can you process net metering application if the Meralco bill is not under my name? (ex. previous house owner)

      Can I start using the system after installation, even if my net metering application is still in process?